Southwestern Landfill Environmental Assessment

Technical Work Plans

Print Link

The Technical Work Plans are an essential part of the Environmental Assessment process. They provide a guide for the technical studies carried out by experts in their field. 

 

Updated Draft Technical Work Plans (Jan-Apr 2017)

Your Input: Comment period closed May 15, 2017. However, if you have any comments or questions, please do not hesitate to contact us. We are available to speak on the phone, answer emails, and meet at our office or at another location that's convenient for you. 

Public Event: Walker held a public event on the Finalization of the Technical Work Plans on April 19, 2017 from 11am - 2pm and 5pm - 8pm at the Colombo Club in Beachville. For more information and event materials, go to our Public Events page

 

Walker is currently in the process of receiving Updated Draft Technical Workplans from our technical consultants. They will be posted on this website as we receive them. 

Any interested individual or organization may submit comments on the Updated Draft Technical Work Plans.The Updated Drafts will also be reviewed by the Government Review Team (Ontario government), the Joint Municipal Coordinating Committee Peer Review Team and First Nations.

 

MEMORANDUM: The Facility Characteristics Assumptions (FCA) document has been updated (revision 2). Since the Technical Work Plans drawn information from the FCA, a memorandum has been prepared as information for anyone reviewing the Updated Technical Work Plans. 

 

Agriculture

The Agriculture Work Plan has been updated from the original draft. The primary changes are focused on detailing how the study will assess the potential impacts to agricultural land-use,   farming operations, and other support services and suppliers.

SUMMARY of Updated Agriculture Work Plan (plain language)

UPDATED DRAFT Agriculture Work Plan (red line - shows updates)

UPDATED DRAFT Agriculture Work Plan

 

 

Air Quality 

The Air Quality Work Plan has been updated from the original draft. The primary changes are focused on clarification to the process determining the areas of study and of potential based on stakeholder conversations.

SUMMARY of Updated Air Quality Work Plan (plain language)

UPDATED DRAFT Air Quality Work Plan (red line - shows updates)

UPDATED DRAFT Air Quality Work Plan 

 

 

Archaeology

The Archaeology Work Plan has been updated from the original draft. The primary changes are focused on clarification to the process determining the areas of study and of potential based on stakeholder conversations.

SUMMARY of Updated Archaeology Work Plan (plain language)

UPDATED DRAFT Archaeology Work Plan (red line - shows updates)

UPDATED DRAFT Archaeology Work Plan 

 

 

cultural heritage work plan coverCultural Heritage

The Cultural Heritage Work Plan has been updated from the original draft. The updates to include the key assumptions related to Facility Characteristics, Land Use Forecast and Climate Change.

SUMMARY of Updated Cultural Heritage Work Plan (plain language)

UPDATED DRAFT Cultural Heritage Work Plan (red line - shows updates)

UPDATED DRAFT Cultural Heritage Work Plan

 

 

ecology work plan coverEcology

The Ecological Work Plan has been updated from the original draft. The updates primarily address an expanded aquatic and terrestrial baseline study area relative to the Thames River as well as other assumptions required for the study.

SUMMARY of Updated Ecology Work Plan (plain language)

UPDATED DRAFT Ecology Work Plan (red line - shows updates)

UPDATED DRAFT Ecology Work Plan

 

 

Economic

The Economic Work Plan has been updated from the original draft. The primary changes are focused around how the economic analysis of greenhouse gas emissions and determination of property value effects will be carried out.

SUMMARY of Updated Economic Work Plan (plain language)

UPDATED DRAFT Economic Work Plan (red line - shows updates)

UPDATED DRAFT Economic Work Plan

 

 

ground and surface water work plan coverGroundwater and Surface Water

The Groundwater and Surface Water Work Plan has been updated from the original draft. The primary changes are focused around additional specification on the methodology to complete the assessment including parameters for flood events, existing flow regimes of the Thames River, and future modeling.  

SUMMARY of Updated Groundwater and Surface Water Work Plan (plain language)

UPDATED DRAFT Groundwater and Surface Water Work Plan (red line - shows updates)

UPDATED DRAFT Groundwater and Surface Water Work Plan 

 

 

Human Health Risk Assessment (HHRA)

The Human Health Risk Assessment (HHRA) Work Plan has been updated from the original draft. The primary changes are focused on an updated list of receptor locations, the addition of the Supplementary Health Review in response to the MOECC Amendment.

SUMMARY of HHRA Work Plan (plain language)

UPDATED DRAFT HHRA Work Plan (red line - shows updates)

UPDATED DRAFT HHRA Work Plan 

 

 

Noise/Vibration 

The Noise/Vibration Work Plan has been updated from the original draft. The primary changes are focused on modifications as to how the field data collection and modelling will occur.

SUMMARY of Updated Noise/Vibration Work Plan (plain language)

UPDATED DRAFT Noise/Vibration Work Plan (red line - shows updates)

UPDATED DRAFT Noise/Vibration Work Plan 

 

 

 

Social

The Social Work Plan has been updated from the original draft. The primary changes are focused around confirming the details for capturing the data and evaluating the potential impacts (both positive and negative) of the project on the quality of life, well being of the community and First Nations.

SUMMARY of Updated Social Work Plan (plain language)

UPDATED DRAFT Social Work Plan (red line - shows updates)

UPDATED DRAFT Social Work Plan

 

 

Updated Draft Traffic Work Plan CoverTraffic 

The Traffic Work Plan has been updated from the original draft. The updates primarily identify the chosen haul route (north on County Road 6, west onto private property), and other assumptions required for the study. 

SUMMARY of the Updated Draft Traffic Work Plan (plain language)

UPDATED DRAFT Traffic Work Plan (red line - shows updates)

UPDATED DRAFT Traffic Work Plan

 

 

Updated Draft Visual Impacts Work Plan coverVisual Impacts

The Visual Impacts Work Plan has been updated from the original draft. The updates primarily address changes to clarify the methodology.

SUMMARY of the Updated Draft Visual Impacts Work Plan (plain language)

UPDATED DRAFT Visual Impacts Work Plan (red line - shows updates)

UPDATED DRAFT Visual Impacts Work Plan

 

 

 

Draft Cumulative Effects Work Plan CoverCumulative Effects

The Draft Cumulative Effects Work Plan work plan is written by Walker Environmental to provide guidance for embedding the evaluation of cumulative effects into each study. It was written using federal EA guidance documents and best practices for Ontario Environmental Assessments. 

SUMMARY of the Draft Cumulative Effects Work Plan

DRAFT Cumulative Effects Work Plan

 

 

 

Submit your comments by May 15, 2017.

 

 

 

Original Draft Technical Work Plans (developed 2013-2014)

Walker Environmental prepared Draft Technical Work Plans as part of the Terms of Reference Phase. These Drafts will be reviewed in consultation with the community and other stakeholders as part of the EA Phase. 

On this page you can find links to the each Draft Technical Work Plan, as well as a video presentation.

 

Agriculture

View the Draft Agriculture Work Plan

 

Air Quality

View the Draft Air Quality Work Plan.

 

Archaeology

View the Draft Archaeology Work Plan.

 

Cultural Heritage

View the Draft Cultural Heritage Work Plan.

 

Ecology

View the Draft Ecological Work Plan.

 

Groundwater & Surface Water

View the Draft Groundwater and Surface Water Work Plan.

 

Human Health Risk Assessment

View the Draft Human Health Risk Assessment Work Plan.

 

Noise & Vibration

View the Draft Noise and Vibration Work Plan.

 

Social & Economic

View the Draft Social Assessment Work Plan and the Draft Economic Assessment Work Plan.

 

Traffic

View the Draft Traffic Work Plan.

 

Visual Impact

View the Draft Visual Impact Assessment Work Plan.

 

Land Use Planning Forecast

Draft Technical Work Plans were not developed for the Land Use Planning Forecast as part of the Terms of Reference. The Forecast will be prepared before the Technical Studies begin. The Forecast will be used as a Baseline or common starting point for all technical studies. It will provide a common understanding of existing and potential land uses in the study area.